Home | Background | Guideline Use | ENTERPRISE | Contact |
||||||
CCTV | DMS | HAR | RWIS | VSL | Dynamic Speed Displays | Ramp Meters| Curve Warning Systems| Intelligent Work Zones | ICWS |
||||||
g | ||||||
|
||||||
g | ||||||
j | ||||||
|
||||||
h | ||||||
Device should be considered if: | ||||||
1. The candidate location is upstream of an area with construction or maintenance activities that are expected to cause at least 15 minutes of delay to the mainline traffic. AND 2. If the candidate location is upstream of traffic control or construction/maintenance activities that are expected to change more frequently than once every 60 days. AND 3. If the posted work zone speed limit is greater than 45 MPH. Notes: Partial Guideline Criteria: |
||||||
CCTV | DMS | HAR | RWIS | VSL | Dynamic Speed Displays | Ramp Meters| Curve Warning Systems| Intelligent Work Zones | ICWS |
||||||
Home | Background | Warrant Use | ENTERPRISE | Contact |
||||||
|