A new GDOT Intelligent Transportation System (ITS) deployment included programming for time-of-day pedestrian scrambles designed for all-way pedestrian crossings during heavy volume times that could be controlled directly from the GDOT TMC. In the past, most intersections required at least six officers to manage the crowd and vehicles; now an intersection can be managed by two officers.