• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
Enterprise

Enterprise

  • About Us
    • Overview
    • Members
    • Join
    • Contact Us
    • History
  • Research Projects
  • Enterprise Management
    • TPF-5(359) ENTERPRISE Phase II – Pooled Fund Final Report
    • Progress Reports
    • Annual Work Plans
    • Management Plan
  • Resources
    • Program Brochure
    • Marketing Materials
    • ENTERPRISE ITS Planning Guidance (Warrants)
    • Helpful Links
    • Members Only

Utah DOT (UDOT)

Replace Copper Wire with Aluminum Wire to Deter Intrusions

Replacing copper wiring with aluminum wiring for long runs and only using copper between the disconnect and the device is an emerging strategy UDOT uses that shows early success for deterring intrusions.

Online Map of Existing and Planned Fiber

Online fiber map displays conduit size, location, length, owner, planned fiber lines, and splice details, and is used by UDOT and its partners for planning, locations, and trouble-shooting.

Small Wireless Facilities Mounting Installations Guidelines

Guidelines, including construction drawings showing allowable small wireless facilities mounting locations on multiple types of UDOT poles, indicate the conditions in which co-location on UDOT structures is not allowed.

Balance Sheet for Tracking Communications Infrastructure-Related Resource Trades

UDOT created and maintains a balance sheet for tracking communications infrastructure-related resource trades involving UDOT and private sector companies. Resource exchanges may or may not be in the location of the negotiated installation and are tracked over time.

Manage Access to Intelligent Transportation System (ITS) Enclosures with Electronic Key/Lock Systems

Electronic key/lock systems can offer an effective approach for managing access to ITS enclosures. Electronic locks are installed on all ITS cabinets and signal cabinets.

Primary Sidebar

Copyright © 2025 by the ENTERPRISE Program. All Rights Reserved. · Log in